Retail Case Study - Debenhams, Bournemouth

Debenhams R22 replacement, roll out programme

An example of one of the many Debenhams stores we have carried out installation works for is The Square in Bournemouth. The store was previously equipped with 67 Toshiba individual split systems, split into eight plant areas around the building.

Controlled Air Solutions worked as a specialised subcontractor to Cofely GDF Suez, re-designing the project utilising Toshiba 2 pipe VRF System's located in only two plant area's.

Each floor was de-commissioned and replaced during normal working hours and commissioned before the next floor is de-commissioned for minimum disruption to the store.

Working closely with the project managers and site management, Controlled Air Solutions were able to offer a full turn key solution to cause minimum disruption to the public and staff well being.

The project comprised of 8 No Toshiba VRF 2 pipe systems and 4 No split systems and 1 No Large Triple System.

The was completed on time, on budget and inline with Debenham's R22 replacement roll out programme requirements.

Other R22 Roll Out Programme sites completed during 2010 / 2011 were:

  • Debenhams Middlesbrough
  • Debenhams Stirling
  • Debenhams Manchester City Centre
  • Debenhams Clapham
  • Debenhams Southport
  • Debenhams Southampton

 

 

back to retail sector >

Accreditations


Contact

Controlled Air Solutions Ltd
Unit A6, Axis Point
Hareshill Business Park
Hill Top Road, Heywood
Lancashire      OL10 2RQ

info@controlledair.co.uk

Phone : 0161 763 3737